hvacgovernmentNC
Neuse River Resource Recovery Facility BNR Basins MCC Replacement
CITY OF RALEIGH
Notice IFB·Set-Aside Construction Services - 000002
AI Summary
Neuse River Resource Recovery Facility BNR Basins MCC Replacement: • Demolition and in-kind replacement of MCC-P4B, MCC-P5B, and MCC-P6B. • Demolition and replacement of PLC-81, PLC-82, and PLC-83 cabinets. • New prefabricated metal enclosure with walls, roof, doors, lighting, and HVAC system to house new MCC and PLC. • Extension of existing concrete foundation to accommodate new enclosure footprint. • Demolition and replacement of all power wire cable within existing conduit from each MCC to each motor and device on BNR Aeration Basins 1-6. • Demolition and replacement of sections of corroded electrical conduit from each MCC to each motor and device on BNR Aeration Basins 1-6.
Contact Information
Contracting Office Address
NC
History
SEP 16, 2026
Bid first posted
Captured from NC eVP
Opportunity Intelligence
Don't miss the next one.
Instant alerts on the jobs you want. Plus Early Signals that predict upcoming bids 60–180 days out from permit data.
Start free trial →