hvacgovernmentNC
Gravity Sewer Creek Crossing Upgrades
ORANGE WATER & SEWER AUTHORITY
Notice IFB·Set-Aside Construction Services - 000002
AI Summary
The Project consists of furnishing all materials, labor, equipment, tools, etc. unless otherwise specified, for the complete and operable installation of: Approximately 223 linear feet of 8-inch ductile iron water, 211 linear feet of 12-inch PVC gravity sewer, and 87 linear feet of 18-inch stainless steel gravity sewer including valve assemblies, connections to existing mains, pressure and disinfection testing, fittings, stream and crossing stabilizations, erosion control, sanitary sewer manholes and all associated appurtenances as described in the Specifications and as shown on the Drawings. The foregoing description shall not be construed as a complete description of all work required.
Contact Information
Primary contact
David Moore
Contracting Office Address
NC
History
SEP 21, 2026
Bid first posted
Captured from NC eVP
Opportunity Intelligence
Don't miss the next one.
Instant alerts on the jobs you want. Plus Early Signals that predict upcoming bids 60–180 days out from permit data.
Start free trial →