← Bids/mep/SC
mepgovernmentSCFlorence

Pee Dee Generator

SLED
Notice Solicitation
AI Summary

Re-work the existing 400 ampere 480 volt three phase service to install a service entrance rated 400 ampere open transition automatic transfer switch utility side of the existing service disconnecting means. Install a 200 kW natural gas generator to provide backup power to the facility in the event of a utility power outage. The generator and transfer switch are being installed as an “optional standby” system as described in 2020 NFPA 70 a 702

Contact Information
Primary contact
Randy B Bradley
803-609-5537
Contracting Office Address
Florence, SC, 29506
Place of Performance
where the work happens
Florence, SC, 29506
Open in Google Maps →
Attachments & Links
Solicitation documents hosted on SAM.gov.
History
MAY 29, 2026
Bid first posted
Captured from SAM.gov
Opportunity Intelligence
Don't miss the next one.
Instant alerts on the jobs you want. Plus Early Signals that predict upcoming bids 60–180 days out from permit data.
Start free trial →