Active bids
325 resultsLena Sue Beam Boiler Addition Project
GASTON COLLEGE
Project includes providing and installing mechanical, electrical and plumbing equipment in the Lena Sue Beam building to remove the steam powered heating system and provide a hot water heating system. Air purifiers are to be installed on the air handlers.
Refurbish Barrack Facilities, Buildings 4168 & 4169
DEPT OF THE NAVY
This procurement is restricted to the General MACC contractors. Only the General MACC contractors listed on the RFP cover letter may submit a proposal. See attached documents for scope of work and any applicable drawings.
BEQ HP200 Area Paint & Flooring Repairs
DEPT OF THE NAVY
Only General MACC Contractors listed on the General Requirements cover page may submit a proposal for this ROICC Camp Lejeune area of responsibility project. See attached documents for scope of work and any applicable drawings.
Amendment CTX Steam Humidifier
VETERANS AFFAIRS, DEPARTMENT OF
Amendment to CTX Steam Humidifier
Replace Potable water valves at Coast Guard Air Station Clearwater Florida
US COAST GUARD
This combined synopsis/solicitation for construction services is prepared in accordance with the format in subpart 12.6 of the Federal Acquisition Regulation (FAR) as supplemented with additional information included in this notice. This synopsis/solicitation is being advertised as Small Business Set-Aside only. This announcement constitutes the only solicitation; no separate written solicitation will be issued. The solicitation number is 70Z028-26-Q-0000101. Applicable North American Industry Classification Standard (NAICS) codes are: 238220 Plumbing, Heating, and Air Conditioning Contractors, Size standard in millions ($19.0) This requirement is for a firm fixed price construction contract. The contract will be awarded using simplified acquisition procedures in accordance with FAR part 13 The Government will award a contract resulting from this solicitation to the proposer responsible, whose offer conforming to the solicitation will be most advantageous to the Government, Lowest...
Design-Bid-Build AES facility located at Joint Base Charleston, South Carolina
DEPT OF THE ARMY
The U.S. Army Corps of Engineers (USACE) Louisville District hereby issues a Request for Proposal (RFP), Solicitation No. W912QR26BA019, for a Design-Bid-Build project to construct an Aeromedical Evacuation Squadron (AES) Training Building at Joint Base Charleston, SC for the 315th Airlift Wing. A description of the construction project is as follows: Design/Bid/Build Construction of a 23,701 SF facility that will comply with program requirements of the AFRC HANDBOOK 32-1001 Standard Facility Requirements (18 October 2023) and User-requested program of spaces within the building. The training facility will include a large open area for the administrative functions and respective support areas such as conference room, break room, private offices, teaming area, lactation room, restrooms with lockers, classrooms and training rooms, auditorium, and the necessary mechanical and electrical support spaces. The construction includes deep pile foundations, concrete slab, brick veneer,...
Construction of Aeromedical Evacuation Squadron Facility, Joint Base Charleston, SC
DEPT OF THE ARMY
The U.S. Army Corps of Engineers (USACE) Louisville District hereby issues Solicitation No. W912QR26BA019, for procurement, Invitation For Bid, sealed bid for the Design Bid Build Construction of a 23,701 SF Aeromedical Evacuation Squadron (AES) Training facility at Joint Base Charleston, SC for the 315th Airlift Wing. CONSTRUCTION MAGNITUDE: In accordance with DFARS 236.204, the magnitude of this construction project is anticipated to be between $25 million and $100 million.
2025 CDBG: Sanitary Sewer System & Storm Drain Improvements
Monroe, City Of
The construction of ± 2,585 LF of 8" DR 17 HDPE sanitary sewer pipe bursting; ±11 manholes rehabilitations; ±34 new sanitary sewer services for existing structures; ±5,386 LF of rollover curb and gutter following existing roadway elevation, ±2,188 LF of 18" RCP storm drain pipe, ±11 GDOT 1019a structures, leveling and resurfacing upon completion of pipe work including ±256 TONS of OGI Superpave, ±406 TONS of 9.5mm Superpave Asphalt, striping, erosion control; traffic control; bypass pumping; surface restoration; and all other appurtenances required to construct the project. Monroe is committed to Affirmatively Further Fair Housing. This project is covered under the requirements of Section 3 of the HUD Act of 1968. This contract opportunity is a Section 3 Covered Contract Section 3 Business Concerns are encouraged to apply. Monroe is committed to providing all persons with equal access to its services, programs, activities, education and employment regardless of race, color, national origin, religion, sex, familial status, disability or age. Section 3 documents are required prior to Notice of Award. Build America, Buy America (BABA) Contract Clause All requirements of the Build America, Buy America (BABA) Act, 41 USC 8301 note, and all applicable rules and notices, as may be amended, shall be complied with if applicable to the infrastructure project. Pursuant to HUD¿s Notice, "Public Interest Phased Implementation Waiver for FY 2022 and 2023 of Build America, Buy America Provisions as Applied to Recipients of HUD Federal Financial Assistance" (88 FR 17001), any funds obligated by HUD on or after the applicable listed effective dates, are subject to BABA requirements, unless excepted by a waiver.
PREQUALIFICATION FOR PRIME CONTRACTOR for CBTC Annex Automotive Program Expansion
ROWAN-CABARRUS COMMUNITY COLLEGE
Expansion / Renovation of existing 11,995 sq ft building and addition/ replacement of some mechanical equipment, additional Scope of Work details provided in document
South Campus Building S202 Ceiling Tile Replacement & Corridors Re-Painting
ROWAN-CABARRUS COMMUNITY COLLEGE
Partial demolition and replacement of existing ceiling tiles and grids per marked-up plans provided, verification/corrections as needed for existing above ceiling infrastructure and independent structural support for any non-compliant anchoring or support of IT cabling, HVAC ductwork, fire alarm devices, lighting, and any other miscellaneous concealed conditions for corrective work, Installation of new ceiling grid and tiles where marked on plans to re-align with existing HVAC and lighting already in place, which may need additional support. Additional Scope of Work in the attached document
Winkler Creek Raw Water Intake Dredging
TOWN OF BOONE
The project consists of all labor, materials, tools and equipment for dredging at the Winkler Creek Raw Water Intake including erosion control, stream crossing, haul road installation, dredging, dewatering, hauling off dredge material, reclamation, fence replacement and gate installation.
Fairway Drive and Hospital Area Improvements
TOWN OF BOONE
THE TOWN OF BOONE DESIRES TO ENGAGE QUALIFIED PRIVATE ENGINEERING FIRMS TO PROVIDE DESIGN, PERMITTING, BIDDING, CONSTRUCTION ADMINISTRATION, AND INSPECTION SERVICES FOR NEW AND REPLACEMENT PUBLIC WATER LINES.
RFQ 2027-003, CMAR - Architectural and Engineering Services for Design and Construction Ad…
COUNTY OF UNION
CMAR - Union County is soliciting SOQs from well-qualified Architectural or Engineering (A/E) firms interested in providing design and construction administration services for the Union County Historic Post Office & West Franklin Street Renovations. The Architectural and Engineering Design firm will be required to provide professional services in conjunction with the services of a Construction Manager at Risk (CMAR). This is a Request for Qualification (RFQ). Responding firms are not required to submit price information nor work product with submittal packages. Compliance with NC G.S. 143-64.31 is required.
Laurel Bay WWTP Conversion (CIP-2306)
Beaufort - Jasper Water & Sewer Authority
Construct a sewer pump station to divert all flow from the Laurel Bay WWTP and discharge them into the sewer basin served by the Port Royal Island WRF.
MTC - Outdoor Welding Lab - Airport
Midlands Technical College
This project consists of a pre-engineered metal building with a concrete masonry unit (CMU) base, metal wall panels, and a steel-grate mezzanine. The scope includes steel-grate stairs, an overhead crane, exhaust fans, extending the campus medium voltage power to the building, power distribution for welding stations, and lighting systems. Site work includes clearing, grading, and construction of a stormwater retention pond.
TDCJ - Murray Install HVAC- Inmate Housing
TX Agency 696
TheTexas Department of Criminal Justice (TDCJ) is requesting qualifications for aConstruction Manager at Risk (CM@R) to provide pre-construction, construction,and post construction services during: the planning and design, construction,construction management, closeout, and warranty phases for the Installation ofnew HVAC systems in Inmate Housing at the Murray Unit in Gatesville, Texas.
IFB Windows, Electric, Plumbing, and Duct Work-Yawkey WMA
Department of Natural Resources
SCDNR is soliciting for vendors to install Windows, Electric, Plumbing, and Duct Work- at Yawkey WMA per the scope of work. Please read the solicitation carefully before responding. Please attend the prebid on 7/22/26 if you are going to bid
Church Street Pedestrian Plaza
City of Anderson
The project consists of improvements to one (1) block of Church Street and Heritage Plaza that shall include but not be limited to demolition (brick crosswalks, granite curb, concrete curb, sidewalks, asphalt, etc.) the installation of new concrete crosswalk, concrete sidewalks, brick pavers, asphalt paving, concrete curb, granite curb, storm drainage inlets and piping, electrical conduit, low voltage lighting, and tree grates.
Repair Building 510 HVAC
DEPT OF THE AIR FORCE
At Building 510, the Contractor will reconfigure the HVAC and DDC Controls throughout and replace mold damaged drywall. Contractor is responsible for moving and storing all contents of the building. All work performed must meet local, state, and federal codes including but not limited to all applicable Department of Air Force Requirements (DAFMAN and DAFI), UFC-430-01FA, Dobbins Design Guide and Dobbins' specifications 101, 1560, 1330 and the United Facilities Criteria's (UFC).
Sam Rayburn Memorial HVAC Rooftop Unit Replacement
VETERANS AFFAIRS, DEPARTMENT OF
Replace HVAC Rooftop Unit and connect Apogee in accordance with the Statement of Work.
BEQ IAQ Monitor System Bldgs HP295 & WC195
DEPT OF THE NAVY
Only Mechanical MACC Contractors listed on the General Requirements cover page may submit a proposal for this ROICC Camp Lejeune area of responsibility project. See attached documents for scope of work and any applicable drawings.
14 WPS Audio/Visual Refresh
DEPT OF THE AIR FORCE
**UPDATE** A SECOND SITE VISIT HAS BEEN SCHEDULED FOR 28 JULY 2026 AT 1300. *Please email zelena.dorudemir@us.af.mil AND CC matthew.mccabe.5@us.af.mil to request base access.* The solicitation will be amended shortly to provide an updated statement of work. Solicitation for the 14 WPS Audio/Visual Refresh, please view the solicitation document and its attachments for all applicable details. There is a mandatory site visit for this solicitation on 28 July 2026 at 1300 CDT. View the Site Visit Instructions in Section L of the Solicitation for all details on how to attend. Quotes received for contractors that did not attend the first OR second site visit will be excluded. All questions are due 31 July 2026 at 1100 CDT. All quotes are due 14 August 2026 at 1100 CDT. The evaluation factors for award are Lowest Price Technically Acceptable (LPTA). In accordance with (IAW) the solicitation instructions, please provide a price break-down in your quote, and a technical capability narrative...
Comprehensive Mechanical Systems Maintenance and Repair Services - Bronson Animal Disease …
Department of Agriculture and Consumer Services (FDACS)
Comprehensive Mechanical Systems Maintenance and Repair Services - Bronson Animal Disease Diagnostic
REBID - Bishopville WWTP Electrical and Control Systems Improvements
City of Bishopville
REBID - Electrical and Control Systems Improvements
Cooling Tower Water Treatment Program-27
UNC - GREENSBORO
The University of North Carolina Greensboro (UNCG) Facilities Operations Utilities department is seeking a Vendor to provide a comprehensive water treatment program for all Cooling Towers on campus. Commodity Code is 83101506 Water Treatment Services.