Active bids
325 resultsBldg RR155 Replace ERU
DEPT OF THE NAVY
M&R MACC: Only M&R MACC Contractors listed on the General Requirements cover page may submit a proposal for this ROICC Camp Lejeune area of responsibility project. See attached documents for scope of work and any applicable drawings.
PRE-SOLICITATION NOTICE NGA HVAC & Ductwork Replacement - Patrick Space Force Base
NATIONAL GEOSPATIAL-INTELLIGENCE AGENCY (NGA)
Revise the response due date to July 27, 2026 PRE-SOLICITATION NOTICE - NGA HVAC & Ductwork Replacement - Patrick Space Force Base In accordance with Federal Acquisition Regulation (FAR)/Revolutionary FAR Overhaul (RFO) 12.201-1(c)(2)(i) and FAR/RFO 5.101(a), the National Geospatial-Intelligence Agency (NGA) is providing notice of a proposed contracting action for commercial services of labor, supervision, tools, materials, equipment, transportation, permits, logistics, and management required for the replacement of air-handling units (AHUs), modification of existing ductwork, installation of an attic exhaust fan, and air-balancing at Patrick Space Force Base, Florida. This is not a request for quotation, and a solicitation will not be posted. Any prospective solicitation will be issued in accordance with FAR/RFO 12.201-1 following the method described in 12.201-1(c)(2) conducted among selected small business entities. The North American Industry Classification System (NAICS) code for...
508-22-104 | Upgrade PACS System
VETERANS AFFAIRS, DEPARTMENT OF
Site Visits: Wednesday, 29July2026 Building 13 @0900 RFI Due date: 6August2026 @1300 Proposal Due Date: 19Aug2026 @1300
(RE-BID) North Carolina Department of Natural and Cultural Resources, Division of Parks an…
STATE OF NC - CONSTRUCTION OFFICE
RE-BID Hanging Rock State Park - Water Improvements
Residential Doors Modification
Department of Behavioral Health and Developmental Disabilities
Private Residence - Contractor must be enrolled w/SC Medicaid as BHDD-OIDD waiver service provider-Environmental Modifications. Only bids from qualified enrolled providers accepted. Widen 3 cased openings & other finish work as detailed in 3 pages of Construction Documents dated: 6/26/2026. Foundation Type: Concrete Slab. Residence Type: Stick Built (Composite Sided) Work Required: Plumbing: No; Electrical: No; Mechanical: No; Framing: Yes.
Industrial Park Pump Station Replacement
City of Newberry
The project consists of the installation of a new pump station to replace the existing Industrial Park Pump Station. The work includes a new pre-cast concrete wetwell, duplex suction lift pumps / controls, a new control building, a diesel bypass pump, a dual auger screen, approximately 254 LF of 12-inch gravity sewer, approximately 133 LF of 12-inch forcemain, electrical work, site grading, demolition of the existing pump station, and associated work tasks.
Dr. H. J. Brooks Park Improvements Project
Lowcountry Council of Governments
Engineering services regarding the design of a park to include the restoration of the basketball court; demolition of playground equipment; installation of ADA-accessible playground equipment and a pavilion; demolition of the existing baseball field lighting; installation of new lighting; re-fencing the 2.5 acre park; landscaping improvements; rehabilitation of the on-site restroom; installation of a walking trail; and installation of trash receptacles and park benches - if funding permits.
RFB 2026-031 Fire Hydrant Maintenance Project
TX Agency M1612
The City of Waco has issued this solicitation for the maintenance service of approximately 740 fire hydrants within the noted section of the City of Waco. This is approximately one-eighth (1/8) of the City's inventory of fire hydrants. The service is to include, but not limited to, exercising the fire hydrants, conducting pressure tests, greasing various hydrant parts and conducting minor hydrant repairs to be tracked through an online dashboard. In addition, thecontractor shall immediately report non-working or irregularly operating fire hydrants and hydrant valves to the City of Waco. At this point, said fire hydrants shall be evaluated for repair or replacement and said fire hydrant shall be repaired or replaced according to the City of Waco's instructions. Work may be performed Monday through Friday, 7:00 AM to 5:00 PM. The contractor shall furnish all labor, tools, equipment, fuel, and backfill material.• General Contractor shall self-perform 60% of this project.• The following design and construction criteria referenced in this document are promulgated by City of Waco Staff to support the implementation of the policy adopted by City Council.• The City of Waco will provide access to the plant for the contractor. Work shall be completed 365 calendar days after Notice to Proceed is issued via email or other communication method.• The Contractor agrees to employ only orderly, competent, and knowledgeable workers, skillful in performance of the type of work required under this contract. The contractor will ensure that their personnel and vehicles/equipment are clearly marked with the company logo or other marking to identify who they work for.• Detailed specifications are attached as Appendices.• A digital version of this document can be obtained from the City of Waco's Bonfire portal at waco-texas.bonfirehub.com/login or the City of Waco Website at waco-texas.com/bids.• The contract period will run with the City’s fiscal year from October 1st to the subsequent September 30th, with 2 optional 1-year renewals.
Restoration and Remediation Services
UNC - WILMINGTON
UNCW is seeking proposals from experienced and qualified contractors to provide restoration and remediation services, including but not limited to, remediation of facility damage resulting from campus activities or accidents, fire events, water damage, biological contamination, flooding, and other related incidents on an "as-needed" basis.
Residential Bathroom Modification
Department of Behavioral Health and Developmental Disabilities
Priv. Residence-Contractor must be enrolled w/SC Medicaid as BHDD-OIDD waiver service provider-EMs. Demo bathroom as indicated. Install provided shower & acc. Provide & install new subfloor, toilet, wall-mount sink, vinyl plank flooring & other finish work as detailed in 6 pages of Construction Documents dated: 6/24/26. Available Budget is inclusive of shower & acc. provided by BHDD-OIDD, approximately $4,400. Type: Crawl Space, Stick Built (Brick Sided). Work Required: Plumbing.
Hazwaste Processing Area Upgrades
University of South Carolina
Interior Renovation: The work for this project consists of reconfiguring the interior space to create a dedicated hazardous waste collection and disposal area. Scope includes constructing new partition walls and installing new doors to fully enclose the area, along with all associated Mechanical, Plumbing, Electrical, and Fire Protection modifications as indicated in the contract documents. All work will be completed in a single phase by a single prime contractor.
Fire Sprinkler System
Greenville County
Greenville County is soliciting sealed proposals on behalf of the Tigerville Fire Department from qualified fire sprinkler contractors for the design, permitting, installation, testing, and acceptance of a new automatic fire sprinkler system in an existing two-story fire station. A mandatory pre-proposal meeting will be held at 9:00AM on July 24, 2026, at Tigerville Fire Department, 2605 Highway 414, Travelers Rest, SC 29690.
Design-Build Services for the Bridge of the Americas (BOTA) Land Port of Entry (LPOE) Mode…
PUBLIC BUILDINGS SERVICE
The planned project is to design and construct a U.S. Land Port of Entry that will reflect the critical importance of this crossing as a gateway to the United States of America. The DB scope of work includes all labor and materials required to provide design and construction services for the BOTA LPOE project pursuant to the Federal Acquisition Regulation (FAR) Two-Phase Design Build Selection Procedures and incorporating Art in Architecture Program, and Design-Construction-Operational Excellence policies and procedures. The resultant contract will be firm fixed price. The project is funded under the Infrastructure Investment and Jobs Act (IIJA). Phase 1 is complete. The shortlisted offerors were announced via www.sam.gov. Phase 2 RFP is hereby issued under Amendment 0002 with an award anticipated January 2027. This is a negotiated, best value procurement. Any questions regarding this notice shall be directed to the Contracting Officer whose name appears herein. Shortlisted offerors...
BL047-26 State Route 120 Water Main Replacement
Gwinnett County Government
State Route 120 Water Main Replacement
Raleigh Police Department Evidence Facility
CITY OF RALEIGH
One ground up 26,000 SF load bearing masonry structure, one 24,000 SF Pre-Engineered Metal Building, finishes, sitework/utilities & exterior improvements. The following bid packages are expected: 01 General Trades, 03 Concrete, 04 Masonry. Structural Steel & Misc. Metals, 06 Millwork, 07A Roofing, 07B Waterproofing & Joint Sealants, BP08A Doors Frames & Hardware, 08B Glass & Glazing, 08C Overhead Doors, BP 09A Drywall, BP 09B Acoustic Ceilings, BP 09C Flooring, BP 09D Painting & Coatings, BP 10A Specialties, BP 10B Wire Mesh Partitions, BP 10C Storage Shelving, BP 11A Equipment, BP 12A Furnishings, 13A Pre Engineered Metal Building, 13B Cold Storage, 21A Fire Protection, 22A Plumbing, 23A HVAC, 23B Geothermal Wells, 26A Electrical & Low Voltage, 31A Sitework & Utilities. See pre-qualification form for further information.
Ramsey Welding and CNA Lab Upgrade at our Madison Site
ASHEVILLE-BUNCOMBE TECHNICAL COMMUNITY COLLEGE
The main focus will be upgrades to electrical systems, lighting, and ventilation, along with comprehensive cleaning and painting.
Multi-Campus Security Systems Upgrade and Expansion
ASHEVILLE-BUNCOMBE TECHNICAL COMMUNITY COLLEGE
This project will encompass renovating an area for Emergency Operations Center, upgrading our security systems at 27 buildings across all four locations, a Generator for the EOC and upgrading our Emergency Annunciator System.
Walkway Cover Replacements - West Columbus High School
COLUMBUS COUNTY BOARD OF EDUCATION
Columbus County Schools is soliciting sealed proposals from qualified contractors to replace existing covered walkways at West Columbus High School.
COMPREHENSIVE FACILITY CONDITION ASSESSMENT AND IMPROVEMENT PLAN
COUNTY OF CUMBERLAND
Cumberland County (the “County”) is soliciting statements of qualifications from experienced and qualified vendors to inspect, evaluate, collect and report on the overall condition of County facilities – to include interior, mechanical, electrical, roofing, envelope and structure of buildings, and ADA accommodations. The Facility Condition Assessment (FCA) will include 40 County facilities, which vary in age, size, and use.
Colleton County (Ruffin) Section Shed Fire Restoration Project
Department of Transportation
Fire/smoke damage restoration for office, 2 bathrooms, storage area, enclosed shop that includes some wood framing/carpentry, insulation, drywall, electrical, plumbing, mechanical, and painting with 2021 SC Code Compliance. Please note and acknowledge Addendum 1 (dated 7/14/2026).
Elevated Tank Exterior Ligting
Lowcountry Regional Water System
The project generally consists of the installation of new electrical distribution and control equipment for an elevated water storage tank exterior lighting system and all appurtenances and incidental construction in accordance with the plans and specifications.
GTC - Brashier 201 Fire Alarm Replacement
Greenville Technical College
The scope of work is to replace the existing fire alarm system (panels and devices) in a like for like manner at Building 201 on the Brashier Campus. The existing fire alarm wiring is assumed to be in good condition and will be reused pending on site investigations by the contractor.
As Needed Plumbing Services at Austin State Hospital (ASH)
TX Agency 529
Solicitation Name: As Needed Plumbing Services at Austin State Hospital (ASH) Description: HHSC PCS is seeking competitive bids to establish a contract for As Needed Plumbing Services at Austin State Hospital (ASH). Mandatory On-Site Visit HHSC will conduct two (2) mandatory on-site visits at the location specified below on the date and time identified in the Procurement Schedule (cover page of this IFB) or on the date and time established in subsequent Addenda. The on-site visit will include a review of the IFB requirements as well as a walk-through of the facility. Attendance at one site visit is mandatory. Failure to attend in person will result in the disqualification of a Bidder. Bidders not listed on the attendance log will not be permitted to submit a Response. Location for On-Site Visit: Austin State Hospital (ASH) 4110 Guadalupe St, Austin, TX 78751, BLDG. 643 Onsite contact: Ruben Mendoza, Ruben.Mendoza@hhs.texas.gov , (512) 419-2371 Bidders must notify the on-site contact listed above regarding attendance. Procurement Schedule - All Times are Central Time Reference Section 2 for further information IFB Date Posted to ESBD July 14, 2026 Mandatory On-Site Visit July 16, 2026, at 10:30 AM July 17, 2026, at 10:30 AM Questions or Clarifications Submission Deadline July 22, 2026 Responses to Questions or Clarifications - Addendum posted on the ESBD July 27, 2026 Courtesy Review of HUB Subcontracting Plan (HSP) Submission Deadline July 30, 2026 Response Deadline: Responses to this IFB must be received August 6, 2026, 10:30 AM Anticipated Contract Start Date September 1, 2026
Southwestern Community College - Founders Building HVAC
SOUTHWESTERN COMMUNITY COLLEGE
Southwestern Community College is seeking proposals from qualified vendors to furnish/deliver/construct/install a comprehensive HVAC system upgrade and modernization for the Founders Building on the Jackson County campus. This RFP seeks to identify engineering and mechanical solutions that meet safety, indoor air quality, and energy-efficiency performance requirements while allowing flexibility in technology, equipment design, and system delivery. The purpose of this procurement is to design and execute a full HVAC renovation or replacement that will support the climate control and ventilation needs of building occupants.
N.C. Department of Natural and Cultural Resources - Division of Parks and Recreation
STATE OF NC - CONSTRUCTION OFFICE
Stone Mountain State Park - Water Improvements